Voith rebuild of dryer section Jass Schwarza paper machine PM1 (EN)
In September 2015, Voith rebuilt the PM 1 at the Adolf Jass paper mill in Schwarza / Rudolstadt. The aim of the rebuild was to increase the maximum production speed for low grammages from 1,400 to 1,500 m/min and at the same time maintain the already excellent machine efficiency. Results of the rebuild: - Productivity increase with the same level of efficiency - ‘Clean design’ for improved runability - Web stabilization for higher machine speed http://www.voith.com/en/markets-indus...
#adolf jass#dryer section#jass schwarza pm 1#paper machine#rebuild#voith#voith paper#web stabilization
LicenseFair Use
